GREEN ROOF PROGRAM Now Available in TX - Claim Your Free Roof Today!

Solar Panel Removal and Reinstallation in Celina, TX

If your roof needs work under the panels, the panels come off first. The goal is simple: fix the roof properly and put the system back the way it was.

Schedule Your Roofing Inspection Today

Fill out the information below and we’ll reach out to complete your estimate as soon as possible!

Call (844) 980-5506
20+ yearsOf experience
FinancingIs also available
DiscountsMilitary, first responders and seniors
Family ownedFully licensed and insured
Houston · DFWAustin · San Antonio

Common reasons to remove panels

Hail or wind damaged the shingles under or around the array.

A leak traced to one of the mounting points.

The roof is being replaced after storm damage.

The owner wants the panels moved to a different slope.

Why this comes up in Celina

NOAA's Storm Prediction Center logged 14 hail reports of 1.75 inches or larger within 10 miles of Celina from 2015 through 2024, and large hail fell in 6 of those 10 years. When a storm damages a roof that already has panels, the damaged shingles under the array cannot be reached without taking the panels down.

Most Celina homes are fairly new: half were built before 2015 (U.S. Census Bureau, American Community Survey 2020-2024). So the reason for removal here is usually storm damage, not an old roof wearing out. That makes timing important, since the roof work often follows an insurance inspection.

Leaks at mounts are the other common trigger. Flashing that was not sealed well at the original install can let water in years later. The fix is to lift the panel above it, reseal the mount and check the decking underneath for moisture before the panel goes back down.

Moving panels is also a chance to fix layout problems, such as an array that blocks a vent or traps debris against a wall. We point out anything like that before reinstalling so you can decide whether to change it.

Step by step

1

Document first

We photograph the panels, rails and roof before anything moves, so their condition is on record.

2

Lift the panels

Panels and racking are taken down.

3

Fix the roof

Shingles, underlayment and decking are repaired or replaced as needed. Our hail damage roof repair in Celina page covers storm work.

4

New flashing at each mount

Mounting points are flashed and sealed into the new roof surface.

5

Reinstall and seal

Panels go back up and the roof around the array is checked.

Why one company for both jobs

Clear responsibility

If a mount leaks later, there is no question about who handled the roof or the panels.

Better scheduling

The roof is not left open waiting for a separate solar crew.

Fewer handoffs

One team documents the condition of the panels before and after.

Insurance and paperwork

If storm damage started the job, removal and reinstallation of panels may be part of what you discuss with your insurer. Whether it is covered depends on your policy and on your insurance company. GemSco documents the work with photos and gives you a written estimate that lists the panel work separately from the roof work.

Before work starts, gather any papers you have from the original installer and note how the system is performing. Take a photo of the monitoring screen if you have one. That gives you a simple before-and-after comparison.

Read more about solar panel removal and reinstallation or our tips on photos to take after roof storm damage. We are family owned, fully licensed and insured, with 20+ years of experience.

Frequently Asked Questions

Do panels have to come off for a roof repair in Celina?

Only if the damage is under or right next to the array. If the problem is on another slope, the panels can usually stay where they are. An inspection shows exactly where the damage is and whether the panels are in the way of a proper repair.

Can the original mounting holes be reused?

On a new roof surface, mounts should be flashed and sealed fresh. Old holes in the decking are sealed or the boards are replaced. Reusing old penetrations without new flashing is a common source of leaks after reinstallation, so we do not cut that corner.

Will my panels be offline during the work?

Yes, the system is shut down while the panels are off the roof. We plan the order of work so removal happens right before the roof work starts and reinstallation follows as soon as the new surface is finished, keeping the downtime as short as possible.

We’re Here to Help!

GemSco Roofing & Solar serves Houston, DFW, Austin, San Antonio and surrounding areas. We’re family owned and fully licensed and insured.

Call (844) 980-5506 GET A FREE QUOTE
Call GET A FREE QUOTE