GREEN ROOF PROGRAM Now Available in TX - Claim Your Free Roof Today!

Solar Panel Installation in Deer Park, TX: The Roof Comes First

Panels last a long time. The roof under them has to last just as long, or they will come off before you planned.

Schedule Your Roofing Inspection Today

Fill out the information below and we’ll reach out to complete your estimate as soon as possible!

Call (844) 980-5506
20+ yearsOf experience
FinancingIs also available
DiscountsMilitary, first responders and seniors
Family ownedFully licensed and insured
Houston · DFWAustin · San Antonio

Roof questions to answer before solar

How old is the roof?

If it has only a few years left, replace it first. Removing panels later adds cost.

Is the deck solid?

Older homes can have soft or uneven decking. Mounts need firm wood and rafters behind them. A soft spot found now costs far less to fix than one found under a finished array.

Any hail damage?

Bruised shingles under an array are hard to reach and easy to forget.

How is the attic vented?

Vents need to stay clear of the array layout. Read how roof ventilation protects your home.

Who owns the house?

The roof and its mounts are part of the property, so the owner decides.

What Deer Park's data adds

Half of the homes in Deer Park were built before 1982 (U.S. Census Bureau, American Community Survey 2020-2024).

78 percent of occupied homes are lived in by their owners, the people who decide on solar.

NOAA's Storm Prediction Center logged 26 hail reports within 10 miles of Deer Park from 2015 through 2024.

7 of those reports were 1.75 inches or larger, in 2019, 2023 and 2024.

Older homes, newer panels

Putting new panels on a house that is four decades old is common. The key is whether the roof surface and the structure under it are ready. Many homes in Deer Park have had their roof replaced in recent years and are good candidates. Others have a roof from long ago, or decking that has seen leaks, and should be fixed before mounting.

Large hail in three recent years is a reason to check the shingles closely. A cracked shingle under an array can leak for a long time before anyone notices. It is easier to replace it now than after panels cover it. Our page on roof inspection in Deer Park describes what a full check covers.

Panel weight and mounting are also worth discussing. Rails spread the load across rafters, but the rafters must be in good shape. A look in the attic answers that question quickly.

Some older homes also have additions or patio covers with a lower slope than the main roof. Those sections often drain differently and may not be good spots for panels. Planning the layout on the main roof planes, away from valleys where water collects, keeps the mounts out of the wettest areas.

From roof check to finished array

1

Inspect the roof and attic

Check shingles, decking, rafters and ventilation.

2

Do roof work first

Repair or replace as needed. See roof replacement in Deer Park.

3

Plan the layout

Choose roof planes with clear space and avoid vents and valleys where possible. Leave room at the edges for future roof access.

4

Mount and flash

Attach to rafters, with flashing at every mount.

5

Install panels

Set rails and panels and check the surrounding roof for any shingles disturbed during the work.

6

Get started

GemSco installs solar panels and works on the roof, so one team looks at both. Estimates are free and roof financing is available. More on our solar panel installation page.

Frequently Asked Questions

Can solar panels go on a roof with two layers of shingles?

It is generally better not to. Two layers make it harder to fasten mounts solidly and to seal them, and a second layer usually means the roof is older. Most owners are better off tearing off to the deck, fixing any damage and installing panels on a single new layer.

How do I know if my rafters can carry panels?

A roofer can look in the attic for cracked, sagging or water-damaged rafters and decking. Most homes can carry a standard array, but older homes deserve a closer look. If repairs are needed, they should be done before the mounts go on, not after.

What should I do if hail hits my panels?

Take photos from the ground, note the date and check for leaks inside. Then have the panels and the roof under them inspected. Read your policy to see how panels are covered and report damage within the deadline. Do not climb on the roof or the array yourself.

We’re Here to Help!

GemSco Roofing & Solar serves Houston, DFW, Austin, San Antonio and surrounding areas. We’re family owned and fully licensed and insured.

Call (844) 980-5506 GET A FREE QUOTE
Call GET A FREE QUOTE